• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Detailed Project Report on E-Waste Recycling Plant
Detailed Project Report on E-Waste Recycling Plant

Electronic wastes, "e-waste... Read More

Capacity :
Plastic: 1.60 MT per day Ferrous Material: 1.00 MT per day, Aluminium: 0.70 MT per day, Glass: 1.00
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are t... Read More

Capacity :
150 Nos per day
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
708.00Lakhs
Add To Inquiry Basket
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World
Setup a Lucrative Business of Solar Panel Renewable Energy is the Fastest-Growing Industry in the World

 

A solar panel is ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business of Medical Disposables Gowns and Drapes
Business of Medical Disposables Gowns and Drapes

 

Surgical gowns mu... Read More

Capacity :
Medical Gowns: 1,250 Pcs per Day Medical Drapes: 1,250 Pcs per Day
Plant and Machinery cost:
209.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.54%
Break Even Point (BEP):
55.16 %
TCI :
0.00 Lakhs
Cost of Project :
529.00Lakhs
Add To Inquiry Basket
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes
Start Investing in Most Growing Business of Medical Disposable Start Manufacturing Unit of Medical Disposables Gowns and Drapes


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient

Production of Ciprofloxacin Hydrochloride (CIPRO) - Active ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Opportunities in Active Pharma Ingredients
Startup Opportunities in Active Pharma Ingredients

 

Startup Opportunities in Active Pharma Ing... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

Active pharmaceutical ingredients are the active substances that are used in the manufacture of a drug and have ... Read More

Capacity :
Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are those that can be recharged. Lithium batteries are now powering a wide range of electrical a... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos./Day
Plant and Machinery cost:
503.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1382.00Lakhs
Add To Inquiry Basket
Bio-Plastic Bags and Containers from Corn Starch
Bio-Plastic Bags and Containers from Corn Starch

Biodegradable plastics are mainly derived from corn, wheat and potato starch. Biodegradable plastics products are ther... Read More

Capacity :
Bio Plastic Bags (Per Bag 25 gms Size): 360,000 Kgs per annum Bio Plastic Containers (Per Containers
Plant and Machinery cost:
546.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2546.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2,gas at O0/1 matm. 1.429 g./l, crit. pressure, 49.7 matm.) is a colorless, odourless, an... Read More

Capacity :
Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
643.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack: 16,800 Nos per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1381.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs ar... Read More

Capacity :
50 Nos./day
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos/day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1076.00Lakhs
Add To Inquiry Basket
E-Rickshaw
E-Rickshaw

Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, t... Read More

Capacity :
1,200 Nos per Annum
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
E-Rickshaw (Electric tuk-tuks) Manufacturing Business
E-Rickshaw (Electric tuk-tuks) Manufacturing Business

E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource... Read More
Capacity :
3000000 Ltrs. /Annum
Plant and Machinery cost:
24.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
62.00 %
TCI :
112.00 Lakhs
Cost of Project :
112.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and new... Read More

Capacity :
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
39.00 %
TCI :
595.00 Lakhs
Cost of Project :
595.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water With PET Bottles
Packaged Drinking Water With PET Bottles
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a mo... Read More
Capacity :
40000 Ltrs./Day
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
171.00 Lakhs
Cost of Project :
171.00Lakhs
Add To Inquiry Basket
BIO PLASTIC PRODUCTS
BIO PLASTIC PRODUCTS

Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consume... Read More

Capacity :
Plant and Machinery cost:
166.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
51.00 %
TCI :
298.00 Lakhs
Cost of Project :
298.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
3000000 Bottles/Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
52.00 %
TCI :
108.00 Lakhs
Cost of Project :
108.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
0
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
54.00 %
TCI :
100.00 Lakhs
Cost of Project :
100.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity :
Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
570.00 Lakhs
Cost of Project :
570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity :
7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity :
7500 Pcs./Annum
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
118.00 Lakhs
Cost of Project :
118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity :
3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
923.00 Lakhs
Cost of Project :
923.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity :
0
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
54.00 %
TCI :
125.00 Lakhs
Cost of Project :
125.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity :
1440 Cubie Meter/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
18.00
Rate of Return (ROR):
18.19%
Break Even Point (BEP):
75.00 %
TCI :
101.00 Lakhs
Cost of Project :
101.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Rolls & Facial Tissue
Paper Napkins, Toilet Rolls & Facial Tissue

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world with out a printed books and news... Read More

Capacity :
1000 Kgs/Day
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
38.00
Rate of Return (ROR):
96.61%
Break Even Point (BEP):
25.40 %
TCI :
53.00 Lakhs
Cost of Project :
53.00Lakhs
Add To Inquiry Basket
Business Plan for Glass Sheet & Float Glass
Business Plan for Glass Sheet & Float Glass

Glass Sheet &a... Read More

Capacity :
Float Glass 8mm: 1,500,000 Sq.mt. Per Annum Sheet Glass 4mm: 3,000,000 Sq.mt. Per Annum
Plant and Machinery cost:
26100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
34600.00Lakhs
Add To Inquiry Basket
How to Start Manufacturing Business of Seaworthy Containers
How to Start Manufacturing Business of Seaworthy Containers

 

What Are Seaworthy Containers?<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Starting a Business? Here's the Best Plans for You!
Starting a Business? Here's the Best Plans for You!

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress (Talalay Process)
A Business Plan for Latex Mattress (Talalay Process)

Latex mattress... Read More

Capacity :
Latex Mattress Size 75 x 70 x 5 inch (33Kg) 30 Nos. Per Day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
208.00Lakhs
Add To Inquiry Basket
Setup plant  Of WIRE NAILS
Setup plant Of WIRE NAILS

Wire nails are a type of fastener, often used in construction and building projects. ... Read More

Capacity :
Wire Nails 160 MT Per Day
Plant and Machinery cost:
2635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
3550.00Lakhs
Add To Inquiry Basket
Setup Plant Of Sodium Bicarbonate  from Soda Ash
Setup Plant Of Sodium Bicarbonate from Soda Ash

 

Sodi... Read More

Capacity :
Sodium Bicarbonate (Powder) 100 MT Per Day
Plant and Machinery cost:
1765.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
3248.00Lakhs
Add To Inquiry Basket
A Business Plan For Wall Putty
A Business Plan For Wall Putty

 

Wall... Read More

Capacity :
Wall Putty 1,850 Bag Per Day
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
412.00Lakhs
Add To Inquiry Basket
Get Started Today and Explore Your Business of Carbon Black N990 Now!
Get Started Today and Explore Your Business of Carbon Black N990 Now!

What is Carbon Blac... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!

What is Rice Bran Oil (Edible Oil)? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of TRANSFORMER OIL
Start Production Of TRANSFORMER OIL

Transformer oil is a type of specialized oil that is used as an insulation and cooling medium in electric... Read More

Capacity :
Transformer Oil 100 KLS Per Day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
9300.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica Gel Crystal & Beads    from Sodium Silicate and Sulphuric Acid
A Business Plan for Silica Gel Crystal & Beads from Sodium Silicate and Sulphuric Acid

Silica Gel crystals & beads from sodium silicate and sulphuric acid are small porous granules made of silica. The process of manufacturing thes... Read More

Capacity :
Silica Gel Crystals & Beads 1000 MT Per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
912.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags  From Corn Starch Plant
Biodegradable Plastic Bags From Corn Starch Plant

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation characteris... Read More

Capacity :
45 kg/hr
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Industry of Geogrid
Start Industry of Geogrid

Geogrid is a polymeric or steel-reinforced plastic grid material used to reinforce soils and create a stronger, more durabl... Read More

Capacity :
Geogrid 30,000 Sq.Mtrs Per Day
Plant and Machinery cost:
879.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1766.00Lakhs
Add To Inquiry Basket
Start Herbicides Production From Artemisia Annua
Start Herbicides Production From Artemisia Annua

 

Artemisia annua, ... Read More

Capacity :
-
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
370.00Lakhs
Add To Inquiry Basket
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging

Four businesses that are now seeing great success in the market are soy nuggets, tea ... Read More

Capacity :
-
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity :
-
Plant and Machinery cost:
275.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
963.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
12345678910...

Showing 361 - 420 of 568 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR